EDiS Company completed a 64,000 square foot addition of 12 new, three-walled composting bunkers. The expanded operation utilizes a 12-window SG Bunker system with GORE covers that features in-ground trenching for leachate capture and reuse. The system separates stormwater from leachate, prevents groundwater contamination, and reduces odors and emissions, enabling the county to meet higher levels of compliance.
Developer
Sustainable Generation
Engineer
SCS Engineers
Surveyor
AULtec, Inc.
SF
64,000